Today is the 23rd June. I have to have two quilts handed in by the 8th June. Tops, backings, battings, quilted, bound, and with a label and a hanging sleeve on the back...
I have one quilt top done, sandwiched, and have begun quilting. It's taking longer than expected and isn't as good as was hoped for.
The other one has yet three blocks to be put together, needs to be pieced, quilted, bound, etc...
I have two weeks to get all this done. With a job and other things in full swing. *sigh*
I could maybe finish the 2nd quilt top this weekend - going away with friends to hang out, but I am an early bird and most of them are night owls (well, I'm a night owl and an early bird) so there will probably be time for sewing...
I have one quilt top done, sandwiched, and have begun quilting. It's taking longer than expected and isn't as good as was hoped for.
The other one has yet three blocks to be put together, needs to be pieced, quilted, bound, etc...
I have two weeks to get all this done. With a job and other things in full swing. *sigh*
I could maybe finish the 2nd quilt top this weekend - going away with friends to hang out, but I am an early bird and most of them are night owls (well, I'm a night owl and an early bird) so there will probably be time for sewing...